Gore Mountain Enhanced Guest Experience with Efficiency Upgrades

Energy Source installed high-efficiency LED lighting combined with advanced control systems to help Gore Mountain achieve maximum operational efficiency.

What you'll learn:

  • $11,521 in annual energy savings.
  • The payback period for the retrofit investment is 6.5 years.
  • A wide range of project benefits include achieving the highest level of efficiency, improve light levels, capitalize on sustainability and lower operating costs.
  • Program incentives through the National Grid PEX program significantly reduced total customer investment.

“At Gore Mountain, we demand value driven, superior results from any contractor working at our site. Energy Source demonstrated from the beginning that they can deliver those results. Energy Source designed an excellent solution and managed the entire project for us; including the proper mix of controls, new fixtures, retrofit upgrades, and standard retrofit lamping to minimize cost and maximize the “wow” factor. Installation was professional and fast, meeting a very tight timeline at a difficult and busy time of the year. The entire project looks great, we couldn’t be more pleased.”

Project Administrator, Olympic Regional Development Authority
Michael Costantino